Philippines
CONSISTEL has completed more than 450 In-building and site
acquisition systems/projects in Philippines. A few of the
many major buildings that
CONSISTEL has completed are:
 |
SM
Megamall is currently the 2nd largest shopping mall in the Philippines and
16th in the world. It has a gross floor area of 331,679sqm and is 5 storey
high. The mall boasts about 550 retailers, service shops dining outlets and
12 film theaters. Its outdoor and indoor parking areas can accommodate about
3,000 cars.
CONSISTEL designed, implemented and provided 2G system and 3G compliant
components with a total of over 90 antennae and more than 4,000m of RF
cables. |
 |
The
Orient Square Building is located in the business district of Ortigas
Centre. It is one of the highest building in the area mainly occupied by
offices and call centers with a total of 46 storey.
CONSISTEL designed, implemented and provided 2G system and 3G compliant
components. There are a total of over 90 antennae and more than 3,800m of RF
feeder cables used to distribute coverage areas which include the lift cars.
A total of 4 months was spent on the the site acquisition and implementation
of the system. |
 |
The
Hyatt Hotel and Casino Manila is composed of 37 storeys and one of the
premier hotels located in the Manila area attracting tourist around the
world and locally.
CONSISTEL designed , implemented and provided 2G system and 3G compliant
components. There are over 90 antennae and more than 3,600m of RF
feeder cables provided for the system. |
 |
The
Makati Medical Center holds the distinction of being the first medical
institution in Asia to achieve dual certification. It has a total of 14
floors in the main building and 10 floors in the new wings with a total
floor area of 12,320 meters.
CONSISTEL designed , implemented and provided 2G system and components with
a total of over 80 antennae and more than 2,500m of RF feeder cables
provided for the system. |
 |
The
Enterprise Centre consists of 45 storey approximately 175m in most office
spaces, located at Ayala Ave in Makati.
CONSISTEL designed , implemented and provided 2G system and components.
There are a total of over 100 antennae and more than 4,500m of RF feeder
cables provided for the system. The site acquisition and implementation
lasted for 5 months. |
Click the
other country locations given below to see their track records:
Back to Track Record Mainpage... |